Masfen is one of the EPC which is willing to be one of the leading company in the energy sector and has installed 5 MW utility PV plant in Çankırı located in middle of Turkey.

The PV project is aimed to generate 5MW of electrical power, and the PV plant will be activated to reduce annual carbon emissions of 3.712 tonnes. In this Project, 22134 pcs modules were used. Performance of the SMA Sunny Central reaches top level, which is higher than the initial expectations.

Location
Çankırı, Turkey

Commissioning
2018

Specific requirements
Central inverters are used for this project

Nominal power
5 MWp

Annual energy yield
10,00 GWh

CO2 savings
3712,50 tonnes/year

System Technology
5 SMA Sunny Central 1000CP-XT
SMA Data Manager
Modules: 22.134 pcs Hanwha Q Cells